News:

Interested in some really terrific mobile apps? Visit www.turboapps.com for details.

Main Menu

Shedule

Started by Torfinn, September 14, 2012, 12:45:52 PM

Previous topic - Next topic

0 Members and 0 Guests are viewing this topic.

Torfinn

I wish somebody can look at this tool,
if i make a wall on 2 x 5 meters, Shedule find out that this is 20 m2 ?? ( 20000000 mm2 )
and for a slab it tell me that yes you have a slab, nice, but normaly i know that alredy, what i want to know is how many m2 it is and the circumference of the slab,
that's information i can use.

Torfinn
V20, V21, 2015 > 2024  Platinum
Deluxe 2015/ 16/ 19
RedSDK enabled
Windows 10 Home Premium (20H2/ 19042.1083) 64 bit, 32 GB
NVIDIA Geforce GTX 780m, 1 GB

nikkipollard

I agree
Have you tried the database tools? You can create reports with a lot more info then the schedule tool
Nikki
TC20 platinum, TC 2015 platinum
TC 2017 with lightworks
TC 2021 platinum
Windows 11 Home 22h

Torfinn

It will be my next level :)
Looking barely at database about 10 years ago, rigth now im testing shedule > spreadsheet and then import the spredsheet to TC again,
not possible in .64 so i re install in .32, after i read another treed about databaseproblem's in .64. in .32 no problem, before that TC crash everytime i tried to import.
It also look like it's when a wall have more then 3 layers it will double the area, im not finish testing that.

Torfinn
V20, V21, 2015 > 2024  Platinum
Deluxe 2015/ 16/ 19
RedSDK enabled
Windows 10 Home Premium (20H2/ 19042.1083) 64 bit, 32 GB
NVIDIA Geforce GTX 780m, 1 GB

Torfinn

#3
And then i find out wat's wrong with the double area, me :)
I use a exterior wall where there is 23 mm gap between the construction and the wallboard for ventilasion of the wall, in that area i have nothing, TC then think i have 2 wall and of course give me the double area, when i fill this area with something it react normal and give's the correct mm2.
It's nothing about how many layer/component the wall have, but making the wall correct in first time  ::)

Still i wish there was more info in the shedule, like the name of style and layer i give it and ofcourse info about the slab's

Torfinn
V20, V21, 2015 > 2024  Platinum
Deluxe 2015/ 16/ 19
RedSDK enabled
Windows 10 Home Premium (20H2/ 19042.1083) 64 bit, 32 GB
NVIDIA Geforce GTX 780m, 1 GB

nikkipollard

I still think you want to create a report via the database tools - no need to connect to an external database.
tools, database, report, create choose what you want to add to the report in the lefthand column, click add when you are done give it a name click ok then report and it will create a report for you unfortunately it doesnt automatically update when you change things but it does remember your report settings so you can easily make a new one.
Nikki
TC20 platinum, TC 2015 platinum
TC 2017 with lightworks
TC 2021 platinum
Windows 11 Home 22h

Torfinn

Yes, now that i know a little about shedule, the next step will be the database, so i will see what i find out about this for the rest of this week.

Torfinn
V20, V21, 2015 > 2024  Platinum
Deluxe 2015/ 16/ 19
RedSDK enabled
Windows 10 Home Premium (20H2/ 19042.1083) 64 bit, 32 GB
NVIDIA Geforce GTX 780m, 1 GB