News:

The purpose of these forums is to discuss TurboCAD.  Please keep the discussion of other products to compatibility issues or how the other software can be used with TurboCAD.

Main Menu
TurboCAD 2026 Platinum box
Now available

TurboCAD 2026.2

The latest update for TurboCAD 2026. It installs over any 2026 build and keeps your activation, drawings and settings. Get it from the Start Page or Help > Check for Update.

? Roof-Slope: How is it Specified in Your Region of the World?

Started by Alvin Gregorio, February 18, 2015, 08:20:23 AM

Previous topic - Next topic

0 Members and 0 Guests are viewing this topic.

Alvin Gregorio

I recently commented that in the architectural building-industry, specifying a roof-slope by _:12 is common-practice.
That was pretty presumptive of me.  I cannot recall the term, but it was _________ of me to presume that all the world was experiencing the same as I, from my experiential perspective.

What is your region of the world?  What is common-practice for specifying roof-slopes in architectural building-construction plans in your region?

-Alvin
Alvin Gregorio
TurboCAD: v2024_Plat (31.0.77.1); v2022_Plat; v2020_Plat; v2019_DL; v20.2_PP
Lenovo Thinkpad P20Y laptop; Windows 11 Pro; i7-11800H 2.30GHz, 8-core; 32GB RAM; NVIDIA T1200
3D_Printer: Ender-3 S1 (NOT Pro)

Torfinn

Hi Alvin

As you know i live in North West Europe, we use the metric system and we use Degree on the roof angle.

But, we use rise and run on a "flatt" roof, minimum is 1:40, so why the heck we dont use like 1,43 degree i dont understand/ know  ???
The same thing come back again when we make a "sidewalk" from the road to the house, we get a rise and run relationship because of weelchair,s  ::)

Torfinn
V20, V21, 2015 > 2024  Platinum
Deluxe 2015/ 16/ 19
RedSDK enabled
Windows 10 Home Premium (20H2/ 19042.1083) 64 bit, 32 GB
NVIDIA Geforce GTX 780m, 1 GB

Alvin Gregorio

Quote from: Torfinn on February 18, 2015, 09:25:36 AM
Hi Alvin

As you know i live in North West Europe, we use the metric system and we use Degree on the roof angle.

But, we use rise and run on a "flatt" roof, minimum is 1:40, so why the heck we dont use like 1,43 degree i dont understand/ know  ???
The same thing come back again when we make a "sidewalk" from the road to the house, we get a rise and run relationship because of weelchair,s  ::)

Torfinn

So the way TurboCAD has been using for assigning Roof-slope values has been making perfect sense to you Torfinn.

Being an American, it never made sense to me that they only used degree°, and not __:12 (there's that 12 again; it always rears it's head in the Imperial/English system).
But I have always cut them some slack, figuring "heck, those software guys didn't go to carpenter-journeyman school or architectural school; how can I expect them to know to make the Roof-slope value __:12".
Alvin Gregorio
TurboCAD: v2024_Plat (31.0.77.1); v2022_Plat; v2020_Plat; v2019_DL; v20.2_PP
Lenovo Thinkpad P20Y laptop; Windows 11 Pro; i7-11800H 2.30GHz, 8-core; 32GB RAM; NVIDIA T1200
3D_Printer: Ender-3 S1 (NOT Pro)

Alvin Gregorio

When I use the Roof Tool in TurboCAD, and I want it to be very accurate, I have always either drawn some construction-lines, and use the Angle Dimension or Measurement Tool to ascertain the degree°, or pulled up my installed Construction Master Pro.  That's a hassle.  (I should have them all memorized, by now-- to the nearest one-hundredth°, anyway; but I don't usually trust my memory)
Alvin Gregorio
TurboCAD: v2024_Plat (31.0.77.1); v2022_Plat; v2020_Plat; v2019_DL; v20.2_PP
Lenovo Thinkpad P20Y laptop; Windows 11 Pro; i7-11800H 2.30GHz, 8-core; 32GB RAM; NVIDIA T1200
3D_Printer: Ender-3 S1 (NOT Pro)

Torfinn

The only way to draw a roof is by degree :) ;)
Why should we use time to calculate the rise based on how long the run is, if the roof is 1 or 1000 meters, a angle is a angle, very easy, and when we come to the point that we need to know the rise, we can charge extra becouse that is not a part of the architectual drawing  8)
But sometime we get a maximum heigth to think about and then we need to use the rise for calculate the angle, i dont like that :)

Torfinn
V20, V21, 2015 > 2024  Platinum
Deluxe 2015/ 16/ 19
RedSDK enabled
Windows 10 Home Premium (20H2/ 19042.1083) 64 bit, 32 GB
NVIDIA Geforce GTX 780m, 1 GB

Alvin Gregorio

#5
Quote from: Torfinn on February 18, 2015, 10:44:08 AM
The only way to draw a roof is by degree :) ;)
Why should we use time to calculate the rise based on how long the run is, if the roof is 1 or 1000 meters, a angle is a angle, very easy, and when we come to the point that we need to know the rise, we can charge extra becouse that is not a part of the architectual drawing  8)
But sometime we get a maximum heigth to think about and then we need to use the rise for calculate the angle, i dont like that :)

Torfinn

"..., we can charge extra becouse that is not a part of the architectual drawing"

Torfinn...  Always have a way figured out to make an extra $. ;D
Wish I had more of that in me. :P

____
I had the feeling __:12 was an American thing.
__:12  --  We usually say "One in twelve"; or "One and twelve"; or, for those whom have never been quite sure (like me) "One 'n twelve".
Alvin Gregorio
TurboCAD: v2024_Plat (31.0.77.1); v2022_Plat; v2020_Plat; v2019_DL; v20.2_PP
Lenovo Thinkpad P20Y laptop; Windows 11 Pro; i7-11800H 2.30GHz, 8-core; 32GB RAM; NVIDIA T1200
3D_Printer: Ender-3 S1 (NOT Pro)

Torfinn

:)
You should try the 3D pdf, i charge about 285 US $ + vat for that. (2000 NOK + 25 % vat)

Torfinn
V20, V21, 2015 > 2024  Platinum
Deluxe 2015/ 16/ 19
RedSDK enabled
Windows 10 Home Premium (20H2/ 19042.1083) 64 bit, 32 GB
NVIDIA Geforce GTX 780m, 1 GB

murray dickinson

#7
I did my apprenticeship in NZ in the mid 1970s, both degrees and metric rise/run were used.   Even metric rise/run is considerably less confusing than imperial, being effectively percentage slope, which is used for hydrodynamic flow calculations.  I've still got my old roofing square from then, rusty (I know: hit me, whip me, call me names) with stamped scales.  On a slightly different note, a friend of mine used to be a senior executive for Australian Customs & Quarantine, and he's got quite a few stories of import shipments of imperial-only rules, scales and other meters being confiscated and destroyed, up until the mid 1980s.   

Alvin Gregorio

In USA, we specify it as shown below, in Elevation Views, Sectionals, etc.  At least I am assuming it's "we"-- it's the only way I've ever seen it done, here in central California; and I've "learned" drafting-style from copying.

And with notes in the Roof page, as well (such as 6:12)

-Alvin
Alvin Gregorio
TurboCAD: v2024_Plat (31.0.77.1); v2022_Plat; v2020_Plat; v2019_DL; v20.2_PP
Lenovo Thinkpad P20Y laptop; Windows 11 Pro; i7-11800H 2.30GHz, 8-core; 32GB RAM; NVIDIA T1200
3D_Printer: Ender-3 S1 (NOT Pro)

Bobich

Residential currently 22.50 or 250. Older Adelaide Villas 320

These are both metric and imperial degrees and it's interesting how metric degrees are still twelfths not tenths e.g. 3000 to a circle; and nobody seems to have a problem with DMS measurements.

Best Regards
Bob
TC 14 Deluxe, TC 19 Pro
Windows 7, 64bit 8GB Ram

nikkipollard

Nikki
TC20 platinum, TC 2015 platinum
TC 2017 with lightworks
TC 2021 platinum
Windows 11 Home 22h

Ric Stewart

360 Degrees in a circle
Increments are 1 (metric) not a fraction of twelve
Ric
TC 2015 Platinum- 64 Bit
TC 21 Platinum-64 Bit-Windows 7
TurboCAD user since V3

jasbrou

Here in southern Louisiana I always heard it as "6 on 12" or "8 on 12", or what ever slope is needed. The reference to 12 makes it
easier for carpenters and framers to lay out the hip and saddle cuts of the rafters and joists using only a framing square.
No compass needed.

nikkipollard

Nikki
TC20 platinum, TC 2015 platinum
TC 2017 with lightworks
TC 2021 platinum
Windows 11 Home 22h

Bobich

Quote from: Ric Stewart on February 19, 2015, 01:06:55 AM
360 Degrees in a circle
Increments are 1 (metric) not a fraction of twelve

In the fps system, feet are increments of 1 so by your reasoning they are metric. (True for the aviators who do have a "metric" foot for altitude).

Apologies for off topic.

Bob
TC 14 Deluxe, TC 19 Pro
Windows 7, 64bit 8GB Ram

henry tideman

#15
Jason B. has origin of roof slope designation of  _ x 12 (tangent to horizontal):
"Here in southern Louisiana I always heard it as "6 on 12" or "8 on 12", or what ever slope is needed. The reference to 12 makes it easier for carpenters and framers to lay out the hip and saddle cuts of the rafters and joists using only a framing square.  No compass needed."

Other than for use in USA by framers, this designation has no use.
Pro Platinum 2016/23.2/61.2
Oregon, Illinois, USA

Alvin Gregorio

Quote from: henry tideman on February 22, 2015, 10:29:28 AM
Jason B. has origin of roof slope designation of  _ x 12 (tangent to horizontal):
"Here in southern Louisiana I always heard it as "6 on 12" or "8 on 12", or what ever slope is needed. The reference to 12 makes it easier for carpenters and framers to lay out the hip and saddle cuts of the rafters and joists using only a framing square.  No compass needed."

Other than for use in USA by framers, this designation has no use.

Just to continue the little conversation...

In my parts-- Central California-- architects, building-engineers, and architectural-draftspersons use __:12, as well.  The use it in notes, and plans... don't recall what they input in the engineering-calculating-software.

Truss-designers in these parts also use __:12, both in their input as well as shown in their drawings & calcs.  I've sat down with a number of truss-designers and designed-as-we-went with them, but I can't remember seeing in their parametric window if they are given the option to enter degrees° as well as __:12.

-Alvin
Alvin Gregorio
TurboCAD: v2024_Plat (31.0.77.1); v2022_Plat; v2020_Plat; v2019_DL; v20.2_PP
Lenovo Thinkpad P20Y laptop; Windows 11 Pro; i7-11800H 2.30GHz, 8-core; 32GB RAM; NVIDIA T1200
3D_Printer: Ender-3 S1 (NOT Pro)