Checking and Approval Procedures

Started by Don Cheke, June 30, 2014, 01:24:38 PM

Previous topic - Next topic

0 Members and 0 Guests are viewing this topic.

Don Cheke

Would anyone like to share how they have implemented checking and approval procedures for drawings in their manufacturing plant environment?

I am not too proud to say that we have been very lax over the last few years and I want to implement a good productive and viable solution.

Here is where we suffer the most:

•   File checking and approval
•   Spelling mistakes (we all make mistakes). I am continually coming across spelling mistakes and it takes a lot of extra work to fix them after the fact.
•   File names not matching drawing titles. File names have been important in my role as design engineer and drawing manager.
•   Part names used in 3D models not reflecting part naming convention precisely (drafts people not taking the time to name the parts in their models correctly).
•   Different parts used on the plant floor than what is specified in the drawings (or vise versa).
•   Revision # not matched in File names and what is on the drawing sheet.
•   Screw sizes, Screw Finish (ZN, SS, etc) and Screw Type (Self-Drilling, Thread Forming, Self-Tapping Sheet Metal, etc.) Again, an internal issue where 3D models and drawings should match what is being used in the plant and they don't.

Do you have people assigned especially to the task of file checking? Where do they fit in the management team? Is it someone familiar with the whole operation? Other thoughts?
Don Cheke
My Blog: One Man's Meanderings

GregT

Most of the companies that I worked for had designated checkers... as did I in my own business. They need to be familiar with about every aspect... drawing standards... project design... etc. Most are not cheap... make more $$ than the designer does at some places.
AMD Phenom 1090T
8GB RAM
Radeon 5450 1GB
Windows 7
Redsdk  - Off
Editing History - On
v19.2 Platinum, x64

WillR

This really is a follow on from your other topic.

This should be a part of or an add-on to your ERP (Enterprise Resource Planning) system and integrated with the ISO system.

Each Part number in the build should have drawings, and revisions attached to the part number. The various checking system should tie to the part numbers for each given variation and revision level.

Failures and defect tracking should tie back to both the job/run and the particular part number/rev level -- or problems never get fixed.

Again -- a topi worthy of a book.

WillR
SW:TC 21 Pro Platinum, FM15, 20 Pro Platinum 64 Bit, also V 19.1 64Bit & 32 bit 17.2 and 18.1; Furniture Maker 14 and 10. HW: Vista 64 Ultimate, AMD 1090 (6 core) 8GB memory Plus also an AMD  8 core systemFX

Don Cheke

Quote from: GregT on June 30, 2014, 02:08:11 PM
Most of the companies that I worked for had designated checkers... as did I in my own business. They need to be familiar with about every aspect... drawing standards... project design... etc. Most are not cheap... make more $$ than the designer does at some places.

Thanks Greg, Your approach seems like the way to go. I will suggest that we 'promote' someone with the right skill set to take this on.
Don Cheke
My Blog: One Man's Meanderings

Don Cheke

Quote from: WillR on July 02, 2014, 09:42:01 PM
This really is a follow on from your other topic.

This should be a part of or an add-on to your ERP (Enterprise Resource Planning) system and integrated with the ISO system.

Each Part number in the build should have drawings, and revisions attached to the part number. The various checking system should tie to the part numbers for each given variation and revision level.

Failures and defect tracking should tie back to both the job/run and the particular part number/rev level -- or problems never get fixed.

Again -- a topi worthy of a book.



Thanks for your input Will. It was part of the process at one time, but with changeovers in staff over the years things have slipped. It my hope that we can get back on track. I don't want you to think that we are running around like chickens with our heads cut off but we do need to get refocused and more efficient in this particular area which can lead to issues all over the place, as I am sure you know what I mean.
Don Cheke
My Blog: One Man's Meanderings

GregT

Quote from: Don Cheke on July 03, 2014, 06:51:31 AM
Quote from: GregT on June 30, 2014, 02:08:11 PM
Most of the companies that I worked for had designated checkers... as did I in my own business. They need to be familiar with about every aspect... drawing standards... project design... etc. Most are not cheap... make more $$ than the designer does at some places.

Thanks Greg, Your approach seems like the way to go. I will suggest that we 'promote' someone with the right skill set to take this on.
You're welcome.

A good checker is worth their weight in gold... as the job sucks... IMO.
AMD Phenom 1090T
8GB RAM
Radeon 5450 1GB
Windows 7
Redsdk  - Off
Editing History - On
v19.2 Platinum, x64

Nickam

I'll second what Greg said. Years ago when I worked in the automotive industry we had a whole department given over to the checker function and it's size was about 30% of the drawing office so definitely not a cheap way to go. The guys were generally all ex designers and on a good salary. It was in the days of working on the drawing board though so it does make one wonder whether that function is quite so necessary these days with CAD as the condition where parts foul each other in operation is easier to check on the actual assembly drawing. The one thing though that is important is that someone else other than the designer does have a look over the drawings, it's amazing how, when you've drawn something you can't see an obvious mistake.
As to drawing numbering systems etc, the big companies such as Ford and Volvo have quite extensive drawing numbering systems. A check online may get you a copy of their system.
Nick
(United Kingdom)
TurboCAD 20 Pro Platinum.
Windows 7 64 bit.

John R

Why does this sound just like beta testing? Find a problem, report it, watch the paint dry. zzzzzz!
John R.

V17—V21, 2015—2025
Designer, Deluxe, (Basic, Expert, Professional), Platinum
RedSDK enabled
Windows 11 Pro (25H2), 64-bit

Don Cheke

Quote from: John R on July 04, 2014, 06:11:32 AM
Why does this sound just like beta testing? Find a problem, report it, watch the paint dry. zzzzzz!

Probably because it is very close to that. It's the poor bugger who puts his/her initials in the APPROVED box that carries the most pressure in the end. I guess that is Dave Taylor in the case of TurboCAD. You and I and the other beta testers can just say oops, missed that one - just doc my pay.  LOL :-)
Don Cheke
My Blog: One Man's Meanderings

Don Cheke

Quote from: Nickam on July 04, 2014, 12:51:13 AM
I'll second what Greg said. Years ago when I worked in the automotive industry we had a whole department given over to the checker function and it's size was about 30% of the drawing office so definitely not a cheap way to go. The guys were generally all ex designers and on a good salary. It was in the days of working on the drawing board though so it does make one wonder whether that function is quite so necessary these days with CAD as the condition where parts foul each other in operation is easier to check on the actual assembly drawing. The one thing though that is important is that someone else other than the designer does have a look over the drawings, it's amazing how, when you've drawn something you can't see an obvious mistake.
As to drawing numbering systems etc, the big companies such as Ford and Volvo have quite extensive drawing numbering systems. A check online may get you a copy of their system.

Thanks Nick. We are mostly slipping on the checking and approval. We have a pretty good naming convention that works pretty well, as long as the team follow the guidelines. I wrote a TurboCAD tip that is based on what we use. http://www.textualcreations.ca/TurboCAD%20Tips/TurboCAD%20Tip%2024.pdf

Oh, that is so true - about not seeing mistakes after having worked on the project. It's like the mind just reads what it knows should be there. I know that it helps to leave it for a couple days and then go back and check, but who's got time to leave if for a couple days in today's 'I need it yesterday' pace. I have found the same issue with writing emails and writing tutorials. I long for a day when I can send out an email without mistakes.
Don Cheke
My Blog: One Man's Meanderings

GregT

Quote from: Don Cheke on July 04, 2014, 06:32:20 AM
Quote from: John R on July 04, 2014, 06:11:32 AM
Why does this sound just like beta testing? Find a problem, report it, watch the paint dry. zzzzzz!

Probably because it is very close to that. It's the poor bugger who puts his/her initials in the APPROVED box that carries the most pressure in the end. I guess that is Dave Taylor in the case of TurboCAD. You and I and the other beta testers can just say oops, missed that one - just doc my pay.  LOL :-)

If you own the company... and are a corporation... I was told by a my lawyer to never put your name in the box... put the company name/initials. Only the company can be sued... not you.

Just a thought.  ;D
AMD Phenom 1090T
8GB RAM
Radeon 5450 1GB
Windows 7
Redsdk  - Off
Editing History - On
v19.2 Platinum, x64

Don Cheke

Quote from: GregT on July 04, 2014, 08:18:48 AM
Quote from: Don Cheke on July 04, 2014, 06:32:20 AM
Quote from: John R on July 04, 2014, 06:11:32 AM
Why does this sound just like beta testing? Find a problem, report it, watch the paint dry. zzzzzz!

Probably because it is very close to that. It's the poor bugger who puts his/her initials in the APPROVED box that carries the most pressure in the end. I guess that is Dave Taylor in the case of TurboCAD. You and I and the other beta testers can just say oops, missed that one - just doc my pay.  LOL :-)

If you own the company... and are a corporation... I was told by a my lawyer to never put your name in the box... put the company name/initials. Only the company can be sued... not you.

Just a thought.  ;D

That is an interesting thought. Thanks.
Don Cheke
My Blog: One Man's Meanderings

colinreid

In the UK many large companies set up Quality Assurance Depts or designated staff conforming to ISO9001.  I did the job in a department in a large Civil Engineering Consultants and each separate project had to have a plan in accordance with targets set out in the QA Manual.  Most firms to convince their clients by seeking  outside compliance to the ISO with external compliance audits.  Picking the right staff for the checkers role can be a bureaucrats haven and compliance with yout QA Manual can descend  into box ticking on forms.  My view always that if it was a choice between good checking with badly filled forms against the opposite, I would take the former.

Given that the home of QA was the Ford Motor in the 50's, there must be plenty of information around to read up on.

If it was me, I would complete writing your checking  procedures keeping it as simple as possible.  Designate someone for separate projects to carry out that role and then audit them occaisionally (if neccessary as boss do this to personally any displeasure for failure) to ensure your will is being carried out. Really in the end its is a calculation of risk and cost of failure or correction as the limit of what to spend on it.  In my old employers firm failure could cost millions to correct and therefore something like 5% of turnover was set aside.
regards
Colin Reid
TC2018 Pro Platinum 64 bit  + LW plugin on Win10 desktop and  Quad Intel i7 with 32GB RAM + 128GB  SSD and 2TB partitioned hard disk, NVidia 2GB video

Ken Simmons

Even though everything is in CAD and we use "Lean Mfg." process, we still have incorrect data on our prints (not updated), but considering we have thousands of parts, some parts may be changed do to customer. It's frustrating to have to do re-works.