News:

Be sure your post is relevant to the current discussion.  Create a new topic within the appropriate board if you are unsure.

Main Menu
TurboCAD 2026 Platinum box
Now available

TurboCAD 2026.2

The latest update for TurboCAD 2026. It installs over any 2026 build and keeps your activation, drawings and settings. Get it from the Start Page or Help > Check for Update.

Product Development Lifecycle

Started by Don Cheke, April 17, 2014, 03:01:26 PM

Previous topic - Next topic

0 Members and 0 Guests are viewing this topic.

Don Cheke

Does anyone have a link to a good resource that describes what Product Development Lifecycle is and how it is implemented? Or experience with it - and can describe it?
Don Cheke
My Blog: One Man's Meanderings

Bobich

Hi Don,

Back in my oil industry days I did a marketing course and basically products are divided into 3 types

A one time purchase e.g. house
An infrequent time purchase e.g. car
A regular time purchase e.g. toothpaste.

The one time follows a bell curve
The frequent time follows a J curve
And the infrequent is a hybrid of the previous 2.

There are many specialist books on the subject. For a basic understand I would recommend a book such as "Australian Marketing Management" by Kotler Fitzroy Shaw ISBN 0 7248 0059 x.

Hope this helps

Best Regards
Bob
TC 14 Deluxe, TC 19 Pro
Windows 7, 64bit 8GB Ram

murray dickinson

Don, if you mean product lifecycle management, which is what PTC pushes with Creo, Dassault Systems with Catia, and Siemens with NX, it's systems that encompass the entire product lifecycle from market niche identification or product conception, through to the product's retirement due to obsolescence or unviability.  Along the way, it's used to assess and control the cost and timelines of design and development, production, promotion, quality and warranty compliance.  CAD/CAM  is sort of the spearhead of PLM, but it's the total system that justifies the tens-of-millions of dollars price tags that, ten or fifteen years ago, bought several hundred seats of a CAD system alone.  It's something that sells to large companies with diverse or extensive product portfolios, rather than specialised or niche manufacturers, because the expense can be amortised over multiple product lines.

Don Cheke

Thanks Bob, Thanks Murray,

I have a client that asked me to look into this for them. The term he used was snagged from a Cimquest email newsletter about incorporating 3D printing into one's product development lifecycle. We already use 3D printing as a big part of our development process. My client said that this reminded him that we should look into product development lifecycle. Perhaps he was referring to PLM. We already have incorporated PDM which I suppose it part of PLM and the products we produce are all part of a recycle plan when they require replacement. Maybe I should ask him if he is thinking about PLM.

I asked this forum question on the SolidWorks forum as well and I got zero responses, so the term 'product development lifecycle' must not be correct.
Don Cheke
My Blog: One Man's Meanderings

Rod Cole

Interesting topic.

I don't have anything specific to the question being asked, but it does bring to mind something that I read fairly recently.  There is a book called The Long Tail  that discusses the value and longevity of niche markets.

Kind of the opposite approach to product development.  A smaller yet sustained market for niche or novelty products rather than the high volume and short time frame of typical consumer products as related to the peak area under the curve on a graph.

This represents an alternative to the typical high dollar approach typically seen on consumer products, yet the returns can be quite impressive over time.
TC V21 Pro Platinum  Win 7 Professional

Don Cheke

In further communications with my client he stated: "I am more interested in adopting a more rigorous product design and development "process" or "system" for controlling / driving how we develop and launch new products, etc."

Does this spark any ideas?
Don Cheke
My Blog: One Man's Meanderings

Bud Lovel

This is probably not exactly what you are looking for, but...

The Pencil: A History of Design and Circumstance [Paperback]
by Henry Petroski

I recommend it.

Bud
Win 8.1 Pro ~TC 21.2 Pro Plat
ASUS Sabertooth X79 LGA 2011 Intel X79
Intel Core i7-4930K~PNY NVIDIA Quadro K2200
G.SKILL Ripjaws Z Series 32GB (4 x 8GB) DDR3 1866 
Corsair CPU Cooler H100i
SanDisk Ultra Plus 256GB SATA 6.0GB/s SSD
Seagate Barracuda 1 TB (x2)
Stable @ 4.5 GigHz overclocked
NICE

Marek

In the literature on marketing, basic phases are distinguished in the classic product life cycle:
introduction to the market,
sales growth, the achieve full development,
drop,
withdrawal of the obsolete product.

As for the same product, it is possible to distinguish
- planning, design
-execution model
-testing
-implementation of product
-vision of development
-improvement, improving functionality

These last , are just my thoughts, and I do not have any experience in this area.
Marek
Marek

TC Pro 2016, TC Pro 2018, TC Plat 2019,TC Plat 2020,TC Plat 2021,TC Plat 2022,TC Plat 2023,TC Plat 2024, TC Plat 2025
Laptop Asus i7 6500U, dual-core 2,50GHz, NVIDIA GeForce GTX 950M, RAM 12 GB, SSD 480GB
Windows 10 64 bit

Bobich

Quote from: Don Cheke on April 22, 2014, 08:53:40 AM
"I am more interested in adopting a more rigorous product design and development "process" or "system" for controlling / driving how we develop and launch new products, etc."

Does this spark any ideas?

Well yes but IMHO it's now moving into the realms of systems analysis, ( producing a suitable algorithm for design and development) and then on to project management of same.

Best Regards
Bob
TC 14 Deluxe, TC 19 Pro
Windows 7, 64bit 8GB Ram

Riftvalley

Apologies that this post is a little out of date, but some years ago I attended a seminar at which a gentleman Preston Smith presented a paper that has considerably influenced my views on product development.

He has written an excellent book that has stood the test of time.  It is called 'Developing Products in Half the Time' and is a very easy read and even more important relatively easy to implement (the ideas can even be slipped under the radar in a conservative environment and things just get quicker).  An essential read for anyone in a product development environment.

Developing Products in Half the Time (2nd Edition)
Preston G. Smith and Donald G. Reinertsen
John Wiley & Sons

Martin
MS Win10 Pro, i7-3770K processor, Nvidia GeForce GTX, 500GB SSD, 2T HD, 16GB RAM (32GB Virtual). Gigabyte Mobo.  TC since 3.5" floppy days.  Now 2018 Platinum although still use Ver 11 for beam tool (not compatible with Ver18, or version 21).   Cannot get TurboCadCam ver 3.0 to work on Win 10 machin

WillR

Quote from: Don Cheke on April 22, 2014, 08:53:40 AM
In further communications with my client he stated: "I am more interested in adopting a more rigorous product design and development "process" or "system" for controlling / driving how we develop and launch new products, etc."

Does this spark any ideas?

Don:

Pretty familiar with this -- both rigorous and informal as I developed computer systems for one of the big manufacturers. We had to handle everything from concept through sales deployment to Engineering Change Orders (ECO) for field discovered bugs. We had systems that covered every aspect of this from the CAD (Real CAD including automation instructions and programming), documentation, engineering aspects and the inevitable ECOs.

It is a lot of work but it reaps big rewards for customers that churn out complicated or high tech products. It can even reap big rewards for simple but high volume product.

We had ISO 9001 manufacturing before it was formalized. We could track down to a transistor or resistor or a wire run in a system with millions of components -- and we had many thousands of designs. We could tell you what batch of components we purchased and where it went. We also tracked component characteristics as part of the design and development process.

Each drawing and engineering document was tracked through inception to approved revisions.

I could (and have) written papers and books on this.

When I started working on software projects I treated it like Hardware development -- zero bugs. It can be done.

My company also did different styles of manufacturing plants -- though we tended to specialize in process (as opposed to assembly) style plants and did a lot of "V form" plants.

The product launch of course should be part of the 4P process. (Product, marketPlace, Price and Package) -- then on to formal sales raining and customer feedback and acceptance tracking and surveying.

Sorry I don't have a glib catchy response other than the 4P system for marketing. I have a marketing wizard here who helps me on that -- her best record is 95% of a national market -- based on what appears to be the simplistic 4P system. It works. Price really is not the driver...

Anyway I don't have a lot more time for this today. Maybe more later if it is helpful.

Anyway -- hth

Also: With some information on the type of product and type of plant people could be more helpful -- process vs assembly, (or hybrid) job shop vs flow shop etc. as it affects scheduling and data collection.

Cheers!
WillR
SW:TC 21 Pro Platinum, FM15, 20 Pro Platinum 64 Bit, also V 19.1 64Bit & 32 bit 17.2 and 18.1; Furniture Maker 14 and 10. HW: Vista 64 Ultimate, AMD 1090 (6 core) 8GB memory Plus also an AMD  8 core systemFX

Don Cheke

Quote from: Riftvalley on June 27, 2014, 03:24:11 AM
Apologies that this post is a little out of date, but some years ago I attended a seminar at which a gentleman Preston Smith presented a paper that has considerably influenced my views on product development.

He has written an excellent book that has stood the test of time.  It is called 'Developing Products in Half the Time' and is a very easy read and even more important relatively easy to implement (the ideas can even be slipped under the radar in a conservative environment and things just get quicker).  An essential read for anyone in a product development environment.

Developing Products in Half the Time (2nd Edition)
Preston G. Smith and Donald G. Reinertsen
John Wiley & Sons

Martin


Thanks Martin. I have book marked it on Amazon and will check it out more closely.
Don Cheke
My Blog: One Man's Meanderings

Don Cheke

Quote from: WillR on June 27, 2014, 09:49:40 AM
Quote from: Don Cheke on April 22, 2014, 08:53:40 AM
In further communications with my client he stated: "I am more interested in adopting a more rigorous product design and development "process" or "system" for controlling / driving how we develop and launch new products, etc."

Does this spark any ideas?

Don:

Pretty familiar with this -- both rigorous and informal as I developed computer systems for one of the big manufacturers. We had to handle everything from concept through sales deployment to Engineering Change Orders (ECO) for field discovered bugs. We had systems that covered every aspect of this from the CAD (Real CAD including automation instructions and programming), documentation, engineering aspects and the inevitable ECOs.

It is a lot of work but it reaps big rewards for customers that churn out complicated or high tech products. It can even reap big rewards for simple but high volume product.

We had ISO 9001 manufacturing before it was formalized. We could track down to a transistor or resistor or a wire run in a system with millions of components -- and we had many thousands of designs. We could tell you what batch of components we purchased and where it went. We also tracked component characteristics as part of the design and development process.

Each drawing and engineering document was tracked through inception to approved revisions.

I could (and have) written papers and books on this.

When I started working on software projects I treated it like Hardware development -- zero bugs. It can be done.

My company also did different styles of manufacturing plants -- though we tended to specialize in process (as opposed to assembly) style plants and did a lot of "V form" plants.

The product launch of course should be part of the 4P process. (Product, marketPlace, Price and Package) -- then on to formal sales raining and customer feedback and acceptance tracking and surveying.

Sorry I don't have a glib catchy response other than the 4P system for marketing. I have a marketing wizard here who helps me on that -- her best record is 95% of a national market -- based on what appears to be the simplistic 4P system. It works. Price really is not the driver...

Anyway I don't have a lot more time for this today. Maybe more later if it is helpful.

Anyway -- hth

Also: With some information on the type of product and type of plant people could be more helpful -- process vs assembly, (or hybrid) job shop vs flow shop etc. as it affects scheduling and data collection.

Cheers!


Thanks for your insights Will.

One of my long time clients (since 2009), for whom I have worked nearly full time for the last year or so as a design engineer and drawing manager, has been around for a very long time (1956 I think it started) but was taken over by new owner in the early 90's. They originally started as manufactures of insulated glass units but began to create doors for the refrigeration industry (doors like you would find on the freezers and coolers in grocery stores, on deli cases, on vending machines, and many other types of merchandisers you see all over the world). Little know fact is that those who create the cabinets, don't create their own doors. They purchase them from companies like ours. The new owners have worked hard at making the glass plant and the door plant as efficient as can be through automation. As the company expands and we take on new customers and create our own in-house designs we have had to implement many additional procedures and policies to meet all manner of food industry regulations and the like. We have also being trying institute procedures to get the new products developed in a much more timely manner as our customers are always wanting things quickly. Much of this is new to me and I do work remotely as the plants are in the US and I am in Canada. The distance has been a bit of an issue at times (like when I need something in the plant checked and I have to ask someone to do it for me instead of looking for myself) but we manage nonetheless.

We have much of this product lifecycle business implemented, although I don't think we called it that, but we are always looking for ways to improve and I have often been tasked with gathering more info.

BTW, My client received ISO 9001:2000 Certification in 2004.

Anyway, thanks again for your insights.
Don Cheke
My Blog: One Man's Meanderings

WillR

Don:

So it is essentially a job shop for final assembly -- the doors -- driving a glass plant (Process/flow shop). Orders drive everything I assume -- as opposed to building stock -- for the assembly or job shop.

Plus the door assembly might well be part process/flow as well -- sheet metal, bending -- would not know till I knew the exact procedures...

By process or flow -- I mean they are bringing in rolls or sheets or rods or bulk chemicals and form "something" that can be tracked as a discrete unit. i.e. cut a piece of metal -- stamp it form it drill it -- and assign a part number and a revision level.

The glass plant likely builds some common components. So it likely will try to group orders for common types of glass and build the glass as a "run" -- other wise it likely becomes inefficient.

Car plants are mostly assembly plants these days -- the fenders, engines, shock assemblies are built elsewhere -- and the process work goes on there.

Most academic work is either in job shops or process shops -- not too many people build and document hybrid systems -- that's what I used to design. i.e -- Scheduling through shop floor data collection, tie-in to engineering and re-work and logistics -- linking to the ERP.

Scheduling for flow/process is quite different -- most ERPs can be configured one way or the other.

You have no idea what you are getting into...

Probably best not to know... ;)

WillR
SW:TC 21 Pro Platinum, FM15, 20 Pro Platinum 64 Bit, also V 19.1 64Bit & 32 bit 17.2 and 18.1; Furniture Maker 14 and 10. HW: Vista 64 Ultimate, AMD 1090 (6 core) 8GB memory Plus also an AMD  8 core systemFX