Using Leader-Dimensions with "Markers" & Database Table for "Notes"

Started by Alvin Gregorio, April 21, 2013, 11:02:47 AM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Alvin Gregorio

Hello Everyone,

Plugging along and finalizing-for-building-department-submittal the multi-sheet plans for the 20k sf commercial project I am involved in (steel-building ["Butler"-type], with multiple offices and a large shop-area within).

----
In an effort to mitigate clutter, and make the plans easier to read, I think I might be interested in utilizing Leader-Dimensions with "Markers" (a symbol with a reference-number or letter in it) along with a synced Database Table with the notes, that Database Table updating as necessary.

I know niikipollard has done extensive work in this area.  I was wondering if you, nikki, or anyone else find this to be an efficient way of annotating architectural-plans in TurboCAD?  (I'm using version 19.2 Deluxe; build 54.2).  Or, is it cumbersome, undependable, and not worth the effort?

Is it a fairly easy procedure to learn?  Where would be the best place for one to start the learning process?-- the Help Documentation?- the TurboWiki?- these Forums?(any links???)

----
Thanks in advance for any input into this Topic.

-Alvin
Alvin Gregorio
TurboCAD: v2024_Plat (31.0.77.1); v2022_Plat; v2020_Plat; v2019_DL; v20.2_PP
Lenovo Thinkpad P20Y laptop; Windows 11 Pro; i7-11800H 2.30GHz, 8-core; 32GB RAM; NVIDIA T1200
3D_Printer: Ender-3 S1 (NOT Pro)

nikkipollard

Check that databases are in deluxe. I thought they were platinum only.
I dont annotate this way because I find contractors dont read the notes.
I think it could be done - but time consuming initially
I only use markers to number things - that I am not going to  reference in a schedule.
For things that I am going to reference in a schedule I create a block with block attributes for the number(the tag must be the
same as the column header) I would have a separate table for the numbering system from the notes
So that you just move on to the next number when you need to add a note.
First read the help file on databases and database connect.
Link the note and the number to the block the block attribute will change once you sync the data  and the note will be added as a custom property.
If you have microsoft access it is easy to connect to the database file as there is a direct link.
You can use an excel file but you have to set it up (google odbc).
Or else you can add the first custom property to your block.
Create a report using the database report function and save it as a microsoft access file (this works in 20 I dont think it did in 18).Remember you need 2 separate tables for the numbers and the notes so you will need 2 separate files. -(if you have access you can have the 2 tables in the same file.)
Once you have the files link as per the help.
When everything is done instead of saving your report you can add it as a table to your drawing.
Nikki
TC20 platinum, TC 2015 platinum
TC 2017 with lightworks
TC 2021 platinum
Windows 11 Home 22h

John R

John R.

V17—V21, 2015—2025
Designer, Deluxe, (Basic, Expert, Professional), Platinum
RedSDK enabled
Windows 11 Pro (25H2), 64-bit

Alvin Gregorio

Quote from: nikkipollard on April 21, 2013, 09:37:03 PM
Check that databases are in deluxe. I thought they were platinum only.
I dont annotate this way because I find contractors dont read the notes.
.....
When everything is done instead of saving your report you can add it as a table to your drawing.

Hi Nikki.  Thanks for the detailed response.  See... I KNEW you were up on this stuff.  I know you've spent a lot of time figuring this out and working with it.
Seems to be some learnin' I need to do.
I'll have to check if what I am after is even possible in version-19-Deluxe.

----
For the drawing I am working on, I am using as a reference an AutoCAD-created drawing likely done by a "college-trained" draftsperson.  She used the method I described in my original Post-- pretty clean!!  But:

RE:  "I dont annotate this way because I find contractors dont read the notes".  It's obvious you've been in the industry a while.

Having been/being a general-contractor and framing-sub-contractor for many years, I feel you there.  And you are 95% correct.  When I first started, I didn't like to read all the notes on the sides and on sheets I considered not to be germane to my work-to-be-done.  Then I got burnt a few times-- did things incorrectly that- if I had read the notes- I would have known the detail.  Didn't take me long to get into the habit of forcing myself to read all the notes... even the boring, long, general notes.

Today, I get very frustrated with contractors and tradespersons that don't read the notes-- especially the notes in drawings that I drew!!**
So, for that same reason as you, I try not to use notes off to the side or on different sheets; tradespeople don't like to read the notes!
Having said that:  Man!- using "Leader-Markers" along with a Note-Table sure is clean; and-- as you can see-- I am wordy, and like to explain everything to the "nth", so you can imagine how cluttered--  and thereby un-clear-- my drawings can become.

Thanks a bunch Nikki for your detailed response.  I will give it some exploration and thought.

-Alvin

----
**Just very recently, I drew the plans for a very small garage-extension.  The general-contractor is my best friend, and I-- along with a carpenter he provided-- did the framing.  The homeowner is a concrete-ready-mix plant owner, so he had a concrete-contractor he knew do the foundation.  Since I nor my friend were getting paid for over-seeing the concrete-contractor, we didn't supervise nor double-check his work before he poured.
     Being we are in earthquake-country, I called out two Simpson Steel-Strongwalls on the very front wall ("bump-out" walls, 8" in front of the garage-door header wall).  The Strongwalls require two 1" dia. x 20" bolts.   Well.... when I got there to frame, ALL FOUR BOLTS WERE IN THE WRONG WALL!!!--- and.... they used the wrong bolt-template (a Hardi-frame template), so, even if the bolts were in the correct location, they wouldn't work for the special-order Strongwalls that were on-site.
     Just as you said Nikki:  The concrete-contractor's foreman DIDN'T READ THE NOTES!!  and they were right there, via Leader, next to the details.  Knowing construction-people, I make everything clear and even redundant.
     Same thing with the curb-wall that made up the perimeter of the garage-extension:  I called out (in a few locations) a 6" wide curb-wall, but the one day I happened to go by the job-site when they had it formed, they had it 18" wide-- I had "l.o. 6" curb" on a Leader-Note, with "l.o." in my abbreviation-table (line of), but the concrete-foreman thought that was a typo and it was to be 1'-6".  There were even two sectionals clearly showing it was 6"----  frustrating.   Construction people don't like to read the notes or look at the details (in general).   Except for maybe the college-educated guy in the office of a large company, doing the estimating.
Alvin Gregorio
TurboCAD: v2024_Plat (31.0.77.1); v2022_Plat; v2020_Plat; v2019_DL; v20.2_PP
Lenovo Thinkpad P20Y laptop; Windows 11 Pro; i7-11800H 2.30GHz, 8-core; 32GB RAM; NVIDIA T1200
3D_Printer: Ender-3 S1 (NOT Pro)