News:

Be sure your post is relevant to the current discussion.  Create a new topic within the appropriate board if you are unsure.

Main Menu
TurboCAD 2026 Platinum box
Now available

TurboCAD 2026.2

The latest update for TurboCAD 2026. It installs over any 2026 build and keeps your activation, drawings and settings. Get it from the Start Page or Help > Check for Update.

Multiple pages vs multiple files

Started by PHM, March 18, 2011, 09:24:31 AM

Previous topic - Next topic

0 Members and 0 Guests are viewing this topic.

PHM

When a project requires more than one drawing, do you prefer to create one project file with each drawing on a separate page or create separate files for each drawing? Which way is best?
Change a little part of the world.
www.kiva.org

wd

I guess it depends on the design and the complexity.I prefer to make separate drawing files.Why you say? less confusion for other users,less chance for oversize file,less chance for corruption,more flexibility for doing edits,But I would keep a chronological folder of individual files for easy retrieval.Every thing related to certain project gets it own folder.Kind like a office filing cabinet.I also do that with TC forum members projects.

And does work to the benefit especially when they wish for a follow up on my process and I have to refer to them.A good folder management  practice is beneficial.Unlike my cohorts where some save files where ever they go by just hitting save button and not thinking of the folder path.Than it becomes a savager hunt. :) Its funny I have supervisor who likes to store  his drawing files in the program folder.Which is risky IMO.But I guess everybody has there own preference.


W.D.
Even a mistake may turn out to be the one thing necessary to a worthwhile achievement Henry Ford
If I have ever made any valuable discoveries it has been owing more to patient attention than to any other talent Isaac Newton
I have not failed Ive just found 10,000 ways that won't work Thomas Edison

Brad Easterday

I prefer individual files for each drawing that use paper space (sheets) for different layouts and views of those drawings. As WD mentioned it keeps your files sizes down for quicker loading and save times. And if somehow a file gets corrupted you only lose a portion, rather than all, of your work. It also allows for more than one person to work on a project at the same time. On a floor plan for instance, I create a base file containing the floor plan. Then I Xref that drawing into the various sheet files such as structural or electrical. An advantage to using an Xref is you don’t have to worry about the base floor plan being accidentally modified while someone is working on a sheet. If you do decide to modify the base floor plan, all of the sheet files receive the update automatically.
Brad E.
TC 2022, 2023 Platinum
Windows 11 (64-Bit)

Glenn

Quote from: wd on March 18, 2011, 12:50:30 PM
I guess it depends on the design and the complexity.I prefer to make separate drawing files.Why you say? less confusion for other users,less chance for oversize file,less chance for corruption,more flexibility for doing edits,But I would keep a chronological folder of individual files for easy retrieval.Every thing related to certain project gets it own folder.Kind like a office filing cabinet.I also do that with TC forum members projects.

And does work to the benefit especially when they wish for a follow up on my process and I have to refer to them.A good folder management  practice is beneficial.Unlike my cohorts where some save files where ever they go by just hitting save button and not thinking of the folder path.Than it becomes a savager hunt. :) Its funny I have supervisor who likes to store  his drawing files in the program folder.Which is risky IMO.But I guess everybody has there own preference.


W.D.

I do the same thing but try to use two letters followed by numbers for each drawing and then use an excel spread sheet to list all the details for each drawing that way it is easy to keep track of drawings that have a similar name.
Cheers Glenn

wd

That's pretty good idea Glenn using spread sheet which makes for quick referencing. Autocad 2004 has something almost similar but the Reference Manger has more capabilities such as plot configurations,drawings, text fonts, images.The paths to these referenced files are saved in each Auto Cad drawing..I guess if TC had  something on this line it would be beneficial to some. ;D


W.D.  
Even a mistake may turn out to be the one thing necessary to a worthwhile achievement Henry Ford
If I have ever made any valuable discoveries it has been owing more to patient attention than to any other talent Isaac Newton
I have not failed Ive just found 10,000 ways that won't work Thomas Edison

coxwelljon

I agree with WD on the filing system.  Having a good filing system is paramount to being able to find and access the information quickly if one has to recall it.  My comments are in relation to architectural work.

My folder tree is organized by jobs, year, job no., and type of information.  I always create a folder within the job no. folder for the final drawing files and a PDF folder for PDF's of each sheet when the job is complete.  That way if one makes changes to drawing file for as built conditions there is always a record of what was on the drawings prior to construction start.

My jobs are smaller and I work mostly by myself so I tend to put all of my information in the same file and use a separate paper space for each sheet in the set of drawings.  That said, I "save as" often with a job number at the beginning of the file name and a new consecutive number at the end of the file name (0511smithhouse4) so if I get a corrupt file I can back up to a previous file.  I like having all the sheets in one file as it makes for easier coordination at the end of the project.  I have avoided x-refs as the tools were limited in previous versions.  We now have new tools in the last couple of versions so I may rethink that.

There are some really good suggestions in this thread which have got me to thinking about my process.  The key is to find a process that works for you personally of within your work environment and then be consistent.
Jon Coxwell, AIA
Windows Win 7x64
TC19,20 32 bit, 20,21,22 64 bit (Platinum)
RedSDK usually off  Win 10 pro

Save the Planet
Conserve & Recycle

PHM

The method I've been using so far involves creating a job folder for each job. The job folder contains over a dozen sub-folders including one called Drawings. This Drawings folder has an Excel spreadsheet and 4 sub-folders: Original, Draft, Construction, and Record.

The spreadsheet has my Drawing Index. This file has some generic data which I tweak for each specific job. I usually set this file up before I start any drawing. It allows me to think ahead and gives me a sense of the amount of work I'll have.

Drawing/Original:
Files sent to me by clients or downloaded. They could be PDFs, DWGs, DXFs, images.

Drawing/Draft:
This is where I put any new drawing I'm working on until it's ready for the field.

Drawing/Construction:
This is where I put drawings which have been promoted from Draft-level and are good enough for field use. I'll get these back from the field with notations (or a phone call) so I can make corrections. Sometimes I'll issue a revision.

Drawing/Record:
This is the client's copy.

I think I'm on the right track with this method; however, based on the comments I've read re this topic:

- I think I will keep each drawing in it's own TC file rather than use multiple pages within a file.
- I like the idea of saving each new iteration of a file with a suffix.

Question to coxwelljon: Do you eventually delete the earlier iterations of a drawing once you're satisfied?





Change a little part of the world.
www.kiva.org

coxwelljon

PHM,

No, I retain the files unless I encounter a corruption.  Then I get rid of them.  At some point I will archive the whole job folder to a CD or DVD.  At that point I may delete some files.  I keep most everything as some files are created after major changes requested by clients who often may change their mind even at the last minute.  I have enough past jobs that I sometimes can go back and use a past job as a starting point for a new project.  A lot of my work is residential and often I have clients ask what I have on file that may suite their needs.  With commercial work I get call backs sometimes several years after a project is complete for further modification to a space.  Sometimes these old iterations can be useful as they may show some existing conditions that were deleted from the file in the progress of design.  Just as a note.  I work from a home office and I have all my work files set up on a server on a small network.  Even though I work alone I have several computers and sometime work in the evening on my laptop.  The server which is set up as a Raid one configuration allows me to access the files no mater what computer I use and to have automatic backups.
Jon Coxwell, AIA
Windows Win 7x64
TC19,20 32 bit, 20,21,22 64 bit (Platinum)
RedSDK usually off  Win 10 pro

Save the Planet
Conserve & Recycle

MarkS

I've been able to be casual so far, keeping everything, include unused versions, somewhere in the drawing and/or the paper space.

But it seems like for a serious project something like a revision control system such as GIT would facilitate things. Different components of your project would go in different files. When you branch to do a one-off revision for a client, you could use the branch-tracking and logging capabilities of Git. Then switch back when you need to go back to your original work. Of course, a good numbering system helps. In a company where I once worked there was a whole department dedicated just to revision coordination.

Mark
TCW Pro 14.2
TC Deluxe 16.2 Build 53.2

GregT

I have a folder for each job, and that folder is named for the job number that it is for. I have one file for each part, and the file is named with the job number and a suffix indicating what type of part it is.... such as drive shaft, housing... etc. An example of a typical drawing name would be BRN110322-3. This tells me that the job was started on the 22nd day of the third month of the year 2011, and which company it is for. The -3 tells me what kind of part it is.

Each time there is a revision to that drawing, the file name gets a Rev and number added, such as BRN110322-3 REV 1, and the drawing itself gets a Rev number in the title block, a description of the change(s) in the "Change Block", which sheet the change is on, and what zone the change was made at. A balloon is placed with the Rev number showing where the change is located in the drawing, and this corresponds with the zone in the "Change Block".

If it is a multi sheet drawing, then each sheet gets this info, so that the customer or machine shop knows what the changes are, which sheet the changes are on, and where the changes are located on that sheet.
AMD Phenom 1090T
8GB RAM
Radeon 5450 1GB
Windows 7
Redsdk  - Off
Editing History - On
v19.2 Platinum, x64