Display Origin for Relative Coordinates?

Started by minuteman64, March 01, 2024, 08:25:49 AM

Previous topic - Next topic

0 Members and 0 Guests are viewing this topic.

minuteman64

Working on a drawing involving entering survey data.  I'm using relative coordinates and setting the origin at each transit location.  However, I've lost track of where I was a couple of times and started entering data points way out of wack.  Just wondering, any way to have TC show (some sort of marker) the location of the origin for relative coordinates?

Using TC Deluxe, 2021.

minuteman64

I think I found it.  Checked box that says "User CS" in Preferences and it started giving me a red "X" at the relative origin.

minuteman64

Yep, that appears to be the cure.  So, my thought train would be that if someone elects to use relative coordinates, they will want a reminder of the origin location - thus the default would be to show the origin.  Oh well, guess that's why I'm not a program designer :)

Alvin Gregorio

Quote from: minuteman64 on March 01, 2024, 08:25:49 AMWorking on a drawing involving entering survey data.  I'm using relative coordinates and setting the origin at each transit location.
I am wondering-- questioning-- if this is the best way to go about it.
How are you getting along on this?
Alvin Gregorio
TurboCAD: v2024_Plat (31.0.77.1); v2022_Plat; v2020_Plat; v2019_DL; v20.2_PP
Lenovo Thinkpad P20Y laptop; Windows 11 Pro; i7-11800H 2.30GHz, 8-core; 32GB RAM; NVIDIA T1200
3D_Printer: Ender-3 S1 (NOT Pro)

Alvin Gregorio

#4
Quote from: minuteman64 on March 01, 2024, 08:31:34 AMI think I found it.  Checked box that says "User CS" in Preferences and it started giving me a red "X" at the relative origin.
1) For me, when Mode/Coordinate_System is set to Relative Coordinates, the Relative Origin point showing or not is not dependent upon the User Coordinate System icon set to show or not.
2) I don't get a red "X" that shows me that Relative Origin point, I get a tiny 7-pixel red square, with an inclusive 1-pixel wide black boundary, and a 1-pixel black square in the center. You cannot view this attachment.
Alvin Gregorio
TurboCAD: v2024_Plat (31.0.77.1); v2022_Plat; v2020_Plat; v2019_DL; v20.2_PP
Lenovo Thinkpad P20Y laptop; Windows 11 Pro; i7-11800H 2.30GHz, 8-core; 32GB RAM; NVIDIA T1200
3D_Printer: Ender-3 S1 (NOT Pro)

nikkipollard

#5
Personally I would ask the surveyor to give the data to me in dxf format.

I am not sure I understand what you are trying to do minuteman64.
The way you are doing it sounds like there is room for error.

We have easier options in TC. If the surveyor surveyed the landscape- without buildings the terrain tool can import xyz data.
I have never had relative coordinates from a land surveyor. I guess I need to see an example of what he gave you.
My surveyor would  provide a table with  fixed coordinates based on a GPS coordinate, converted to xyz, calculated using the local mapping convention, such as UTM. (which is relative)
Sometimes you are really far from 0,0 - like a few kilometers, which TC doesn't handle very well.
Just subtract the same amount from all the coordinates to bring it closer to 0,0. - You can do all of the math in a spreadsheet.
There is a Ruby script supplied with Turbocad that can import xyz coordinates. You need to make sure your file is in the correct format.


Nikki
TC20 platinum, TC 2015 platinum
TC 2017 with lightworks
TC 2021 platinum
Windows 11 Home 22h

minuteman64

Well, the surveyor (way old school - like early 1960's) is me - with my $300 Berger optical transit/level, generating data in the form of turned angles and taped distances.  Basically, setting up on a lot corner, back sighting on another lot corner and turning angles and measuring distances to various features on my lot.  Sometimes, because of things like the pesky house getting in the way, I have to set an intermediate station to get good sight lines.

My drawing technique (courtesy of you guys from a way-back post) is to set the origin at a transit station, shift-tab to the x-coordinate field and enter distance, then tab to y-coordinate field and enter ">" followed by the associated angle.  To me it's the most intuitive way to enter the data into the drawing.  Very similar to the way I used to do it with the old Design Cad program.  Anyways, helpful to have a reminder of origin location.

nikkipollard

Ah ok, now I understand.
I would draw a circle, or use an architectural marker at each datum and number it.- they can be on a temporary layer.

Nikki
TC20 platinum, TC 2015 platinum
TC 2017 with lightworks
TC 2021 platinum
Windows 11 Home 22h

Alvin Gregorio

#8
I typically start with finding online and referencing a recorded Tract Map or Parcel Map.
Using the Feet dimensions and surveyor's angles on that, I replicate the plot boundary in TurboCAD.  I'll typically temporarily change my Space Units to Decimal Feet for this, and Angle System to Surveyor.

Then once I have that, I will underlay a Satellite or Aerial Image (also obtained from the 'net' placed on its own Layer) of the property, which shows me the existing streets, structures, landscaping, etc.  I move, rotate, and scale the underlaying image until some known entities-- such as the property boundary fences-- align with the Property Lines created via the paragraph above.

I then ensure to rotate everything that it will best serve my intended drawing sessions and be oriented to the main views I want to eventually present.  Usually, for Tract house work, that means the street and front edges of the house are parallel with the bottom of my screen (orthogonal to the TurboCAD World X axis).

Then I draw a rough sketch of existing structures and anything else substantial such as trees.  Using the image underlay for reference.  It doesn't need to be exact at this stage.

I might increase the transparency on the Image Underlay.
Then I print that out, whatever scale fits the paper.  Grayscale or just Black.  On 11"x17" paper, optimally.

I then go out to the property and do the measuring thing, triangulating from known Property Line points and structure points, measuring for and noting the structures' exterior footprint fairly early on in the process, so I can triangulate off corners of those.  I just jot everything down on my printed-on-paper sketch created from the above.

If I'm fortunate, I can do this while I have my laptop at the property.  I go inside or under a shaded patio and input all this, getting up and verifying things if something isn't jiving.

The above would be the starting basis for a Remodel or Addition design/drafting project.
Then I go inside with my tape-measure and digital-measurer and start measuring for and inputting walls and other elements.

I've done a lot of architectural "as-built surveys" (for architects, designing remodels/additions) and remodel and addition design/drafting work the past couple of decades.  GC'ed or framed a lot of them; which is dirty but satisfying.  I'd rather do new construction-- design/draft and build.
___
Note: I never find the need to switch to Relative Coordinates system when doing the above.
Alvin Gregorio
TurboCAD: v2024_Plat (31.0.77.1); v2022_Plat; v2020_Plat; v2019_DL; v20.2_PP
Lenovo Thinkpad P20Y laptop; Windows 11 Pro; i7-11800H 2.30GHz, 8-core; 32GB RAM; NVIDIA T1200
3D_Printer: Ender-3 S1 (NOT Pro)

nikkipollard

Quote from: Alvin Gregorio on March 03, 2024, 05:24:06 AMI typically start with finding online and referencing a recorded Tract Map or Parcel Map.
Using the Feet dimensions and surveyor's angles on that, I replicate the plot boundary in TurboCAD.  I'll typically temporarily change my Space Units to Decimal Feet for this, and Angle System to Surveyor.

Then once I have that, I will underlay a Satellite or Aerial Image (also obtained from the 'net' placed on its own Layer) of the property, which shows me the existing streets, structures, landscaping, etc.  I move, rotate, and scale the underlaying image until some known entities-- such as the property boundary fences-- align with the Property Lines created via the paragraph above.

I then ensure to rotate everything that it will best serve my intended drawing sessions and be oriented to the main views I want to eventually present.  Usually, for Tract house work, that means the street and front edges of the house are parallel with the bottom of my screen (orthogonal to the TurboCAD World X axis).

Then I draw a rough sketch of existing structures and anything else substantial such as trees.  Using the image underlay for reference.  It doesn't need to be exact at this stage.

I might increase the transparency on the Image Underlay.
Then I print that out, whatever scale fits the paper.  Grayscale or just Black.  On 11"x17" paper, optimally.

I then go out to the property and do the measuring thing, triangulating from known Property Line points and structure points, measuring for and noting the structures' exterior footprint fairly early on in the process, so I can triangulate off corners of those.  I just jot everything down on my printed-on-paper sketch created from the above.

If I'm fortunate, I can do this while I have my laptop at the property.  I go inside or under a shaded patio and input all this, getting up and verifying things if something isn't jiving.

The above would be the starting basis for a Remodel or Addition design/drafting project.
Then I go inside with my tape-measure and digital-measurer and start measuring for and inputting walls and other elements.

I've done a lot of architectural "as-built surveys" (for architects, designing remodels/additions) and remodel and addition design/drafting work the past couple of decades.  GC'ed or framed a lot of them; which is dirty but satisfying.  I'd rather do new construction-- design/draft and build.
Sound right.
Nikki
TC20 platinum, TC 2015 platinum
TC 2017 with lightworks
TC 2021 platinum
Windows 11 Home 22h

minuteman64

Quote from: Alvin Gregorio on March 03, 2024, 05:24:06 AMI typically start with finding online and referencing a recorded Tract Map or Parcel Map.
Using the Feet dimensions and surveyor's angles on that, I replicate the plot boundary in TurboCAD.  I'll typically temporarily change my Space Units to Decimal Feet for this, and Angle System to Surveyor.

Then once I have that, I will underlay a Satellite or Aerial Image (also obtained from the 'net' placed on its own Layer) of the property, which shows me the existing streets, structures, landscaping, etc.  I move, rotate, and scale the underlaying image until some known entities-- such as the property boundary fences-- align with the Property Lines created via the paragraph above.

I then ensure to rotate everything that it will best serve my intended drawing sessions and be oriented to the main views I want to eventually present.  Usually, for Tract house work, that means the street and front edges of the house are parallel with the bottom of my screen (orthogonal to the TurboCAD World X axis).

Then I draw a rough sketch of existing structures and anything else substantial such as trees.  Using the image underlay for reference.  It doesn't need to be exact at this stage.

I might increase the transparency on the Image Underlay.
Then I print that out, whatever scale fits the paper.  Grayscale or just Black.  On 11"x17" paper, optimally.

I then go out to the property and do the measuring thing, triangulating from known Property Line points and structure points, measuring for and noting the structures' exterior footprint fairly early on in the process, so I can triangulate off corners of those.  I just jot everything down on my printed-on-paper sketch created from the above.

If I'm fortunate, I can do this while I have my laptop at the property.  I go inside or under a shaded patio and input all this, getting up and verifying things if something isn't jiving.

The above would be the starting basis for a Remodel or Addition design/drafting project.
Then I go inside with my tape-measure and digital-measurer and start measuring for and inputting walls and other elements.

I've done a lot of architectural "as-built surveys" (for architects, designing remodels/additions) and remodel and addition design/drafting work the past couple of decades.  GC'ed or framed a lot of them; which is dirty but satisfying.  I'd rather do new construction-- design/draft and build.
___
Note: I never find the need to switch to Relative Coordinates system when doing the above.

I'm envious of your skills - way out of my wheelhouse.  Here's how we rolled in the early 1960's (last time I worked on a survey crew).  Get to the office early to snag the only 200 ft. tape that was graduated in 0.01 ft. increments for entire length.  Head to town adm. bldg. to access gps system - which was a map on the wall showing the town divided into sectors - each sector keyed to a paper map drawer.  Pull appropriate map and locate lot/area in question and nearby bench-marks.  Drive to job site and perform task at hand - using optical transit and/or level and tape.  Try and return to office before other crews to use the one Freiden mechanical calculator and avoid having to do calcs. with nine place log tables (or was it 12 place log tables).  Ahhh, the good old days :)

nikkipollard

Quote from: minuteman64 on March 03, 2024, 02:46:15 PM
Quote from: Alvin Gregorio on March 03, 2024, 05:24:06 AMI typically start with finding online and referencing a recorded Tract Map or Parcel Map.
Using the Feet dimensions and surveyor's angles on that, I replicate the plot boundary in TurboCAD.  I'll typically temporarily change my Space Units to Decimal Feet for this, and Angle System to Surveyor.

Then once I have that, I will underlay a Satellite or Aerial Image (also obtained from the 'net' placed on its own Layer) of the property, which shows me the existing streets, structures, landscaping, etc.  I move, rotate, and scale the underlaying image until some known entities-- such as the property boundary fences-- align with the Property Lines created via the paragraph above.

I then ensure to rotate everything that it will best serve my intended drawing sessions and be oriented to the main views I want to eventually present.  Usually, for Tract house work, that means the street and front edges of the house are parallel with the bottom of my screen (orthogonal to the TurboCAD World X axis).

Then I draw a rough sketch of existing structures and anything else substantial such as trees.  Using the image underlay for reference.  It doesn't need to be exact at this stage.

I might increase the transparency on the Image Underlay.
Then I print that out, whatever scale fits the paper.  Grayscale or just Black.  On 11"x17" paper, optimally.

I then go out to the property and do the measuring thing, triangulating from known Property Line points and structure points, measuring for and noting the structures' exterior footprint fairly early on in the process, so I can triangulate off corners of those.  I just jot everything down on my printed-on-paper sketch created from the above.

If I'm fortunate, I can do this while I have my laptop at the property.  I go inside or under a shaded patio and input all this, getting up and verifying things if something isn't jiving.

The above would be the starting basis for a Remodel or Addition design/drafting project.
Then I go inside with my tape-measure and digital-measurer and start measuring for and inputting walls and other elements.

I've done a lot of architectural "as-built surveys" (for architects, designing remodels/additions) and remodel and addition design/drafting work the past couple of decades.  GC'ed or framed a lot of them; which is dirty but satisfying.  I'd rather do new construction-- design/draft and build.
___
Note: I never find the need to switch to Relative Coordinates system when doing the above.

I'm envious of your skills - way out of my wheelhouse.  Here's how we rolled in the early 1960's (last time I worked on a survey crew).  Get to the office early to snag the only 200 ft. tape that was graduated in 0.01 ft. increments for entire length.  Head to town adm. bldg. to access gps system - which was a map on the wall showing the town divided into sectors - each sector keyed to a paper map drawer.  Pull appropriate map and locate lot/area in question and nearby bench-marks.  Drive to job site and perform task at hand - using optical transit and/or level and tape.  Try and return to office before other crews to use the one Freiden mechanical calculator and avoid having to do calcs. with nine place log tables (or was it 12 place log tables).  Ahhh, the good old days :)
Well I like to believe my surveyor uses a similar method to yours Minuteman. But Alvin's method is good for building renovation and alterations.
Nikki
TC20 platinum, TC 2015 platinum
TC 2017 with lightworks
TC 2021 platinum
Windows 11 Home 22h

murray dickinson

Quote from: minuteman64 on March 03, 2024, 02:46:15 PMI'm envious of your skills - way out of my wheelhouse.  Here's how we rolled in the early 1960's (last time I worked on a survey crew).  Get to the office early to snag the only 200 ft. tape that was graduated in 0.01 ft. increments for entire length.  Head to town adm. bldg. to access gps system - which was a map on the wall showing the town divided into sectors - each sector keyed to a paper map drawer.  Pull appropriate map and locate lot/area in question and nearby bench-marks.  Drive to job site and perform task at hand - using optical transit and/or level and tape.  Try and return to office before other crews to use the one Freiden mechanical calculator and avoid having to do calcs. with nine place log tables (or was it 12 place log tables).  Ahhh, the good old days :)

Nobody realised that a foot-long ruler with 100 divisions works with any old 200ft tape? 

minuteman64

I was a Civil Engineering student working as a rod-man/gopher.  The Crew Chief or the Gunner may have had that in their back pockets - but they didn't share it with me :)  The other tapes did have 0.01' graduations at the smart end, but it was very convenient to be able to pick off a precise measurement anywhere along the length of the stretched out tape on a lot of jobs.

murray dickinson

Even if it's a 200ft tape with only feet graduations, not even inches, stretched out, you just drop the graduated ruler between any of the tape's feet graduation marks wherever you need that resolution....

minuteman64

Yep, that would have worked = but I'm pretty sure we never did it.  Must have been a tradition thing :)

murray dickinson

You sure it wasn't a way to inspire staff to get to the office early?  Bosses can be sneaky that way...