News:

All posts discussing pricing or where to buy TurboCAD will be deleted.

Main Menu

4 new videos about a big development and a big school.

Started by KS, December 17, 2019, 03:48:21 PM

Previous topic - Next topic

0 Members and 0 Guests are viewing this topic.

KS

Hi
I have designed a school and a very big plan, where I ask the politicians in my municipality to buy up land so that they can sell plots reasonably to those who do not have much money. Materials are very affordable in Norway. Materials for a small tiny house of 37 m2 will not cost more than 200,000 kr. (US $ 20,000), and a 55m2 to US $ 300,000 (US $ 30,000) if manufactured industrially.
The development shows 100,000 m2 for business, industry and office, 600 apartments, of which 1/3 is tinyhouse 37 or 55 m2.

Here you can see the website that shows the plan.
https://www.turbocad.no/Croftholmen/croftholmen.html

Here is the school:
https://www.turbocad.no/Nyhetsbrev2018/19_des/nyhetsbrev_19_09_2018.html

Here are 4 new videos:
https://www.youtube.com/watch?v=YyvRT36iFCE&list=PLE4XHOXhspdaeqNF-hCoL5brFn1OGVMdP&index=16

Happy Cristmas everybody
Kai :) :) :)
Kai Sannes, Former Norwegian TurboCAD salesperson and instructor.
Dell Precision 7740 laptop
Windows 11 Pro, www.kaisannes.com

Jeff_in_90620

That's some detailed work.  How long does it take to render?


Jeff
Jeff

TC 2026 Pro Platinum plus 2015->2024 (most with LightWorks & RedSDK) & V21
System: AMD Ryzen 9 7950X, MSI Mag X670E Tomahawk WiFi, 64GB RAM @ 4.80GHz, ARC A770 w/16GB, 3 x Samsung NVMe 990 (1TB), Windows 11 Pro (64-bit)

KS

Not many seconds.
163 sec.
My PC are slow.
With a new and better PC it should be don in under 60 sec.
Kai Sannes, Former Norwegian TurboCAD salesperson and instructor.
Dell Precision 7740 laptop
Windows 11 Pro, www.kaisannes.com

AussieBloke

Great designs Kai, I love coming to your norway site from time to time to see what you guys are up to. :o

Tim Stewart

Kai,

All very interesting. 
A large project, for sure! 
Are the building units prefabricated and assembled on site?

Regards Tim
Regards Tim

You can design without engineering, but you cannot engineer without design.
Windows 10 Pro (19043.1165) 64-bit, TurboCAD Designer 2017-2020 and Pro. Plat. 2018-2020 + LW (64-bit) + AnimationLab 6
Intel i5 2500@3.3GHz 8GB Ram NVIDIA Quadro K2200

KS

Tim.
Yes, I am tihinking that the all building units should be prefabricated on site and and assembled on site with a tower crane.
But first the politicians must like this and then we must bring someone with a lot of money. It is a long way to go.
After the New Year I want to make the buildings made the docks more modern with terraces. I only draw one block and just replace the old one with the new one.
By the way, I tested out 3800 houses and easily maneuvered around and zoom inn and out with RedSDK and shadow. It looks almost like LW Quality render. I made a video from that  test and I will post it later.
RedSDK is impressive in the Draft render.
Kai Sannes, Former Norwegian TurboCAD salesperson and instructor.
Dell Precision 7740 laptop
Windows 11 Pro, www.kaisannes.com

Jeff_in_90620

Jeff

TC 2026 Pro Platinum plus 2015->2024 (most with LightWorks & RedSDK) & V21
System: AMD Ryzen 9 7950X, MSI Mag X670E Tomahawk WiFi, 64GB RAM @ 4.80GHz, ARC A770 w/16GB, 3 x Samsung NVMe 990 (1TB), Windows 11 Pro (64-bit)

Don Cheke

That looks like a huge amount of work. Very nicely done Kai.

I think the project is also terrific. I have often thought that if I had money to burn that a housing project for those in need would be the way to contribute to a better city (on a local level).

Keep up the great work!
Don Cheke
My Blog: One Man's Meanderings