Layers malfunction

Started by Blueliner Building, August 08, 2023, 04:38:41 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Alvin Gregorio

#100
Quote from: Blueliner Building on August 23, 2023, 10:58:58 AMYou know, I don't know.  I remember Torfinn urging me to make sure I did delete that, but I'm not sure.  I did hunt for anything IMSI or TC related and seemed to have gotten everything. 

I'm working on the first floor plan now, and will likely be adding some layers to that.  I'll start another thread for advice on that, as I have questions about how best to do some things.  That will be the acid test, it seems to me...
It's a little tough, for us to help you fully.  Since most of us that help don't have Designer; we have to make some assumptions.
But ask away...
  New Topic threads for new topics would be best.

Construction-wise, and design-/drafting-wise, that's quite the project you have taken on.  (with a September 1st anticipated completion date!)
I guess Permitting for this type of project is not required in your area (?)
Alvin Gregorio
TurboCAD: v2024_Plat (31.0.77.1); v2022_Plat; v2020_Plat; v2019_DL; v20.2_PP
Lenovo Thinkpad P20Y laptop; Windows 11 Pro; i7-11800H 2.30GHz, 8-core; 32GB RAM; NVIDIA T1200
3D_Printer: Ender-3 S1 (NOT Pro)

Blueliner Building

Quote from: Alvin Gregorio on August 23, 2023, 11:14:29 AM
Quote from: Blueliner Building on August 23, 2023, 10:58:58 AMYou know, I don't know.  I remember Torfinn urging me to make sure I did delete that, but I'm not sure.  I did hunt for anything IMSI or TC related and seemed to have gotten everything. 

I'm working on the first floor plan now, and will likely be adding some layers to that.  I'll start another thread for advice on that, as I have questions about how best to do some things.  That will be the acid test, it seems to me...
It's a little tough, for us to help you fully.  Since most of us that help don't have Designer; we have to make some assumptions.
But ask away...
  New Topic threads for new topics would be best.

Construction-wise, and design-/drafting-wise, that's quite the project you have taken on.  (with a September 1st anticipated completion date!)
I guess Permitting for this type of project is not required in your area (?)

Thanks!  You have all been very helpful!

As for September 1 completion date, that date is the target date for STARTING to dismantle the roof and second floor walls.  I already have most of the demolition upstairs done.  All of the non load-bearing walls removed, all the hardwood flooring removed (and reclaimed); 70% of the subflooring removed and replaced with Advantech T&G subflooring.    I can see I'm not going to make my Sep 1 target date for dismantling the roof.  But hopefully I won't miss by much.  My goal is to have it framed, sheathed, windows installed and roofed before December.  I think I can...